1. What are the important characteristics of a good software?
2. Compilers, Editors software come under which type of software?
3. Software Engineering is defined as systematic, disciplined and quantifiable approach for the development, operation and maintenance of software.
4. What is the full form of RAD Software process model?
5. In software engineering, Software project management *SPM (contains of a number of activities, which contains ______).
6. Which of the following option is not defined in a good Software Requirement Specification (SRS) document?
7. Which of the following is the simplest model of software development life cycle?
8. Which of the following is the understanding of software product limitations, learning system related problems or changes to be done in existing systems beforehand, identifying and addressing the impact of project on organization and personnel etc.?
9. Which design identifies the software as a system with many components interacting with each other?
10. A Software consists of ______.
11. Which of the following is the most important feature of spiral model in software development lifecycle?
12. If every requirement stated in the Software Requirement Specification (SRS, has only one interpretation, SRS is said to be correct ______.
13. ______ is not a step of Requirement Engineering?
14. Identify which of the following life cycle contains the phases: test case design, test execution, defect tracking, maintenance.
15. Identify the incorrect phase of STLC (Software Testing Life cycle).
16. What does the RAD software process stand for? And When the RAD model should be completed?
17. ______ is the first step of SDLC?
18. Identify the correct functional requirement.
19. Total number of phases of RAD lifecycle model is-
20. For ______ reasons, the waterfall model not suitable.
21. ______ Model, which does not relate to the Evolutionary Process Model?
22. ______ is also known as Verification and Validation Model?
23. Which of the following models will not result in the desired output, when the user participation isn’t involved?
24. Identify the two dimensions of the spiral model.
25. Identify among the following which is not recommended for software processes in software engineering?
26. Identify the incorrect type of Prototyping model.
27. Choose the advantage of the Iterative model among the following.
28. When is the ‘risk analysis’ in the spiral model performed?
29. The ______ is also known as ______.
30. Identify among the following which is not a type of incremental testing approach.
31. ______ option which does not apply to agile software development model?
32. ______ is the correct option, which is involved in the system planning and designing phase of the Software Development Life Cycle (SDLC)?
33. The study of an existing system refer to ______
34. ______ is the major drawback of RAD model.
35. Model selection is based on ______
36. ______ option is correct.
37. Which of the following models doesn’t necessitate defining requirements at the earliest in the lifecycle?
38. Which of the following model will be preferred by a company that is planning to deploy an advanced version of the existing software in the market?
39. The agile software development model is built based on ______ option.
40. On ______ basis, the plan-driven development different from that of the software development process?
41. ______ framework activities are carried out in Adaptive Software Development (ASD)?
42. Which of the following technique is involved in certifying the sustained development of legacy systems?
43. Build & Fix Model is suitable for programming exercises of ______ LOC (Line of Code)
44. Which one of the following is a functional requirement?
45. ______ is known as Agile serum methodology.
46. The full form for CASE is:
47. ______ is one of the important attributes of good software.
48. ______ is the founder of the spiral model?
49. ______ suits the Manifesto for Agile Software Development.
50. Those engineers who develops the quality software should not ______.